EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
DaveBellairs
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (655)
Research
Workshop
- (4)
Empennage
- (14)
Fuselage
- (54)
Firewall
- (78)
Tail Feathers
- (40)
Wings
- (105)
Controls
- (6)
Avionics
- (152)
Lighting
- (13)
Instrument Panel
- (9)
-
Cabin air and...
-
Bench panel assembly
-
Panel and subpanel...
-
More panel populating
-
More throttle,...
-
Throttle bracket
-
Riveted angle
-
Angle attachment
-
Instrument panel
Landing Gear
- (4)
Engine
- (159)
Propeller
- (1)
Fuel System
- (7)
Interior Finish
- (3)
Paint / Decals
- (6)
Inspection
Tools
Builder Name:
Dave Bellairs
-
Project:
Vans - RV-7
-
VIEW REPORTS
Total Hours:
1467.9
Total Flight Time:
Start/Last Date:
Jun 24, 2017 - No Finish Date
Engine:
Lycoming IO-360
Propeller:
Whirlwind 200RV
Panel:
Advanced Flight Systems Avionics
Friendly URL:
https://eaabuilderslog.org?s=DaveBellairs
Home or Last Project Picture
Dec 29, 2021
Angle attachment
- (2 hours)
Category: Instrument Panel
Continued prep of instrument panel for attachment of support angle. Scuffed, masked and primed area on back of panel where angle attaches. Countersunk holes on front of panel for rivets. Painted oil door frame.
46FE05EE-93CD-4BCA-A2DC-B8F4BD901009.jpeg
238A783A-99A8-4F6B-A326-EE31F3EBA644.jpeg
868975AD-40FC-4D41-9333-438E47D88118.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.